AKPINAR

Infrastructure / Completed Projects / Europe 1st Region 2012 1st Stage Tunnel Construction

Work completion date
:
11/05/2016
Employer
:
İstanbul Metropolitan Municipality - İstanbul Water and Sewage Authority (İSKİ)
Location of project
:
İstanbul, Turkey
Tunnel Length
:
4.073 m
Excavation Diameter
:
2,90 m
Waste water channel
:
3.211 m
Construction Method
:
The tunnel with completed inner diameter of 2,20 m will be constructed with a tunnel boring machine by entering from the shaft.

ÜNAL AKPINAR İnşaat Sanayi Turizm Madencilik ve Ticaret A.Ş. Güneş Sokak No:31 Kavaklıdere 06690, Ankara, T: (312) 468 79 60 (4 Hat), F: (312) 468 93 41, info@ua.com.tr
İşbu sitenin tüm hakları saklıdır. Web sitesi içerisindeki dökümanlar ve resimler kaynak gösterilse dahi, izin alınmadan başka web sitelerine, ticari yayınlara aktarılamaz, kopyalanamaz. © 2013