Infrastructure / Projects in Progress / General Directorate of State Hydraulic Works Silvan Dam Transmission Channel 1st Stage Construction (Babakaya Tunnel and Transmission Line)
Work completion date
:
31-05-2024
Employer
:
General Directorate of State Hydraulic Works
Location of project
:
Silvan, Turkey
Tunnel Length
:
2 x 5.320 m
Excavation Diameter
:
7,80 m
Excavation Method
:
TBM
Channel Length
:
7.500 m
C. Type - Section Area
:
Corrugated steel – 162 m2
Construction Method
:
Two parallel tunnels each 5.320 meters long are being constructed with TBM. Corrugated steel channel is excavated with drilling-blasting method and with sliding form channel coating machine.
ÜNAL AKPINAR İnşaat Sanayi Turizm Madencilik ve Ticaret A.Ş.
Güneş Sokak No:31 Kavaklıdere 06690, Ankara,
T: (312) 468 79 60 (4 Hat), F: (312) 468 93 41,
info@ua.com.tr