Infrastructure / Completed Projects / Kirazlıköprü Dam and HES Facilities

Work completion date
:
31/12/2012
Employer
:
Devlet Su İşleri Genel Müdürlüğü
Location of project
:
Bartın, Turkey
Derivation Tunnel Length
:
927 m
Tunnel Excavation Dia.
:
6,66 m
Body Crest Length
:
240 m
Body Crest Width
:
10 m
Body Volume
:
1.943.879 m3
Highway Length
:
8,5 km
Bridge/viaduct length
:
615 m
Construction Method
:
Tunnel excavation manufacturing was made ​​by the drilling-blasting method, support has been provided by spray concrete, wire mesh, rock bolts and retaining, tunnel isolation have been provided by injection after the tunnel covering has been constructed by reinforced concrete. The current road under the dam lake area was reconstructed with the potable water transmission line. The scope of the construction of highway includes two units of pre-stressed viaducts with total 575 m length, cut and cover structure with 240 m length, excavation of 6.000.000 m3, bored pile with 8.500 me length, supporting manufactures, geotechnical analysis and project services. The body of the dam is clay core rock fill type. 

ÜNAL AKPINAR İnşaat Sanayi Turizm Madencilik ve Ticaret A.Ş. Güneş Sokak No:31 Kavaklıdere 06690, Ankara, T: (312) 468 79 60 (4 Hat), F: (312) 468 93 41, info@ua.com.tr
İşbu sitenin tüm hakları saklıdır. Web sitesi içerisindeki dökümanlar ve resimler kaynak gösterilse dahi, izin alınmadan başka web sitelerine, ticari yayınlara aktarılamaz, kopyalanamaz. © 2013